RE: Definition of „shutdown relays“

Yes, the sequencial delay between outputs is applied when pressing the "shutdown" button. So it makes sense to first stop chargers and inverter befor...

Il y a 3 ans
Répondre
RE: CAN integration with Victron equipment

Maybe there was an error on the CANbus. When the Monitor restarts after the firmware update it reinitialzes the CANbus and clears any previous error....

Il y a 3 ans
Répondre
RE: CAN integration with Victron equipment

Hi Andres, Can you post the following screen captures: BMS / Monitor configuration: CANbus voltage and current limits Cerbo GX / Venus: DVCC se...

Il y a 3 ans
Répondre
RE: BMS and Monitor firmware updates

Monitor firmware version 2.02.07 Added backup and restore options on the parameters and triggers configuration screens. The backup is done in sep...

Il y a 3 ans
Répondre
RE: Configuration file to save from Monitor?

As the backup and restore functions do not interfere with the operation of the Monitor or the BMS I have decided to add it now and release new Monitor...

Il y a 3 ans
Répondre
RE: Configuration file to save from Monitor?

Hi Jens, There is currently no option to save the parameters and triggers configuration from the web interface. This feature will be added in versi...

Il y a 3 ans
Répondre
RE: Definition of „shutdown relays“

Hi Jens, The "shutdown" feature is a way to activate relay outputs (or deactivate them if they are activated by default) with a press of a button on...

Il y a 3 ans
Répondre
RE: CAN integration with Victron equipment

It sounds like you have the proper termination resistors at both ends. Using a ohmmeter have you checked that you have the right wires connected to ...

Il y a 3 ans
Répondre
RE: Initial cell balancing

Jens is right and it seems that there might be an important unbalance. What you can do is start charging until the unbalance is above 30mV or so (en...

Il y a 3 ans
Répondre
RE: Skokie - 12V - 460Ah - 2p4s - Victron Multiplus, MPPT, Orion Tr - Valeo Alternator - „Status=Plan“

I am impressed by the thinking that has gone in your plan and the quality of the diagrams. I need to do that for my boat. I like the way you use th...

Il y a 3 ans
Répondre
RE: 48V RV/Semi Electrical Systems - Design Decision and Implementation Project

The BMS relay outputs are protected with PTC (resettable fuses) with a maximum of 2A continuous. It would not be a good idea to operate at the maximu...

Il y a 3 ans
Répondre
RE: Fourgon aménagé : HELP ! Choisir une batterie sans se ruiner ni se faire arnaquer

Bonjour @emax, Je n'ai pas d'expérience de test ou d'usage d'un grand nombre de cellules et ne peux donc pas émettre d'avis ou de conseils utiles. ...

Il y a 3 ans
Répondre
RE: 48V RV/Semi Electrical Systems - Design Decision and Implementation Project

A lot of thinking has gone in your design. Thank for sharing Here are comments to some of your questions: The TAO installation manual outlines ...

Il y a 3 ans
Répondre
RE: Battery Cell Link Drilling

For the Winston cells with 14 mm bolts the easiest is to drill and tap 5mm (M5) holes in the center of 5 of the bolts. There are other suggestions i...

Il y a 3 ans
Répondre
RE: BMS and Monitor firmware updates

Monitor firmware version 2.02.06 When pressing the "relay reset" button on the LED panel when Charge Management has stopped the charge, then the cur...